Does a Repaired Breaker Need a Break-in Period?

When the piston, bushings, or liner of your breaker are replaced, the parts need to "get used to" each other. This is called the **Break-in (Run-in) Period**. If you operate at full throttle immediately after installing new parts, they will overheat and seize.
1. How to Do Proper Break-in?
Pay attention to the following during the first run after repair:
- First 30 Minutes: Operate the breaker at half throttle (50% power).
- Frequent Greasing: Grease twice as much as normal during the break-in period.
- Resting: Run the breaker for 10 minutes and let it cool down for 5 minutes.
2. What Happens Without Break-in?
The surfaces of new parts are microscopically rough. If loaded without break-in, these roughnesses scratch each other (Scoring), and your newly installed parts can fail in the first hour.
Related products
More in this category
Recent articles
Global Mining Report: Cost Analysis in Hard Rock 26 November 2025
Electric Heavy Machinery is Coming: Are Attachments Compatible? 26 November 2025
5 Ways to Save Fuel in Heavy Machinery While Prices Rise 26 November 2025
Noise Pollution Laws and Silent Demolition Technologies 26 November 2025
Future of Construction: "Green Sites" and On-Site Recycling Trend 26 November 2025
Why Made in Turkey? The "Golden Ratio" Between China & Europe 26 November 2025
Our Warranty Policy: Assurance Against Manufacturing Defects 26 November 2025
How Are Your Products Shipped? Safe Packaging for Sea & Air 26 November 2025








